Construction Gallery Turbines with pre-installation completedTurbine components being delivered to Biala Wind FarmThird shipment of wind turbines arrive at Port Kembla.First turbine erected at Biala Wind FarmTurbine components ready to be erected.Biala Wind Farm substation under construction.Crane responsible for lifting components off the delivery trucks, and pre-installation of the bottom tower sections.Crane responsible for lifting components off the delivery trucks, and pre-installation of the bottom tower sections.First turbine blade arriving at site.First turbine nacelle arriving at site.First turbine blade arriving at siteInstallation of cabling between the turbinesAerial view of hardstand preparation around turbine foundationTrial run with blade trailerTurbine blades arrive at Port KemblaDelivery of new electrical transformerSliding transformer onto the steel beamsPreparation of concrete foundations at the substationTrenching machinery for cable layingFoundation mid concrete pourFoundation concrete poured and finishedSteel reinforcement bars for concrete foundation